Skip to Primary Navigation Skip to Site Navigation Skip to Main Content
3M Specialty Vehicle: Quality and Value for the Trailer Industry

Post Prep - Steps 3-4


Post preparation procedure - Steps 3-4

Step 3

Prime post (as required).


Parts List - From Designetics: (1-888-886-8477)

  • 8 oz. fluorinated bottle for primer: 21BF
  • Cap with gasket: 14A
  • Large felt restrictor cap: 56J

  Prime post (as required).
 
Step 4

Apply 3M™ VHB™ Tape (4611, 4941F, 5952).

3M™ VHB™ - Cimarron Case Study - FINAL (PDF, 184 Kb)

3M™ VHB™ Removal from Trailers (PDF, 32 Kb)

Panel Bonding Procedure Technical Bulletin (PDF, 566 Kb)

Specialty Trailer Solutions (PDF, 325 Kb)

  Apply 3M(TM) VHB(TM) Tape (4611, 4941F, 5952).
 
  Questions? 1-800-567-1639 ext. 4074
 
 

Post Preparation - Steps 1-2 | Steps 3-4 | Step 5

Next Steps >>>

For safety always wear goggles, face shield and proper respirator when grinding or sanding. For safety always wear goggles, face shield and proper respirator when grinding or sanding.
Video Resources

Solution Video Library

Panel Bonding Steps

Post Preparation

Backside Preparation

Frontside Preparation (hanging panel)

Frontside Preparation (panel on table)

Assembly