Skip to Primary Navigation Skip to Site Navigation Skip to Main Content
3M Specialty Vehicle: Quality and Value for the Trailer Industry

Front-Hang - Step 3


Panel frontside preparation procedure - hanging panel - Step 3

Step 3

Prime overlap (as required).


Parts List - From Designetics: (1-888-886-8477)

  • 8 oz. fluorinated bottle for primer: 21BF
  • Small felt restrictor cap: 32BD


3M™ VHB™ - Cimarron Case Study - FINAL (PDF, 184 Kb)

3M™ VHB™ Removal from Trailers (PDF, 32 Kb)

Panel Bonding Procedure Technical Bulletin (PDF, 566 Kb)

Specialty Trailer Solutions (PDF, 325 Kb)

  Prime overlap (as required).
 
  Questions? 1-800-567-1639 ext. 4074
 
 

Panel Front Preparation (hanging panel) - Steps 1-2 | Step 3 |

Next Steps >>>

For safety always wear goggles, face shield and proper respirator when grinding or sanding. For safety always wear goggles, face shield and proper respirator when grinding or sanding.
Video Resources

Solution Video Library

Panel Bonding Steps

Post Preparation

Backside Preparation

Frontside Preparation (hanging panel)

Frontside Preparation (panel on table)

Assembly