Skip to Primary Navigation Skip to Site Navigation Skip to Main Content
3M Specialty Vehicle: Quality and Value for the Trailer Industry

3M™ Panel Bonding (English)


Post preparation procedure - Steps 1-2

Step 1

Abrade post with 3M™ TN Quick-Change Clean & Strip XT Disc.


Parts List

  • 3M™ TN Quick-Change Clean & Strip XT Disc: 4 1/2" 00-048011-33194-2
  • Back-up Disc: 00-051111-56573-5

  Abrade post with 3M(TM) TN Quick-Change Clean & Strip XT Disc.
 
Step 2

Spray post with 50-50 IPA:water and wipe clean.

3M™ VHB™ - Cimarron Case Study - FINAL (PDF, 184 Kb)

3M™ VHB™ Removal from Trailers (PDF, 32 Kb)

Panel Bonding Procedure Technical Bulletin (PDF, 566 Kb)

Specialty Trailer Solutions (PDF, 325 Kb)

  Spray post with 50-50 IPA:water and wipe clean.
 
  Questions? 1-800-567-1639 ext. 4074
 
 

Post Preparation - Steps 1-2 | Steps 3-4 | Step 5

Next Steps >>>

For safety always wear goggles, face shield and proper respirator when grinding or sanding. For safety always wear goggles, face shield and proper respirator when grinding or sanding.
Video Resources

Solution Video Library

Panel Bonding Steps

Post Preparation

Backside Preparation

Frontside Preparation (hanging panel)

Frontside Preparation (panel on table)

Assembly