Skip to Primary Navigation Skip to Site Navigation Skip to Main Content All 3M.com Site Map

3M™ One Pass Hallway Fiber Pathway

 
3M(TM) One Pass Fiber Pathway Duct on Spool
3M(TM) One Pass Fiber Pathway Duct on Spool
3M(TM) One Pass Fiber Pathway Duct SC-APC
3M(TM) One Pass Fiber Pathway Duct - No Term
3M(TM) One Pass Fiber Pathway No Term
3M(TM)One Pass Fiber Pathway SC-APC
3M(TM) One Pass Fiber Pathway MPO
3M™ One Pass Hallway Fiber Pathway is a horizontal cable pathway and drop cable solution installed simultaneously in one pass around a hallway perimeter.
One Pass is designed for use in brownfield Multi-Dwelling Units (MDUs) and Multi-Tenant Units (MTUs) serviced by FTTH networks. Available in a variety of lengths, preloaded with 6 or 12 fibers and factory terminated at one end with SC/APC or MPO connectors with an option for no connector.
Need Help?

Questions? We can help

Contact Us

 

Product Resultsvar modelsTxt="Product Results";

Product Options 

25 Results (Displaying results 1-15)
Previous Page
12
Next Page
Part Number3M ID
HALL-300-12-03-00-RH-IV80611381841     
HALL-300-12-03-SCA-LH-IV80611335532     
HALL-200-12-03-SCA-LH-IV80611335599     
8061149551880611495518     
8061149547680611495476     
HALL-200-06-02-SCA-LH-IV80611335771     
HALL-200-12-03-SCA-RH-IV80611335607     
8061149552680611495526     
HALL-300-06-02-SCA-LH-IV80611335821     
HALL-200-06-01-SCA-LH-IV80611335755     
8061149548480611495484     
HALL-200-06-02-SCA-RH-IV80611335789     
HALL-100-06-01-SCA-RH-IV80611335714     
HALL-100-12-03-SCA-LH-IV80611335656     
HALL-300-12-03-SCA-RH-IV80611335540     
25 Results (Displaying results 1-15)
Previous Page
12
Next Page

Specifications

Cable Length200 Linear Foot, 300 Linear Foot, 100 Linear Foot
Connector TypeUnconnectorized, MPO, SC/APC
Duct ColorIvory
FamilyOne Pass Hallway
Fiber Color CodeColors 1-12, Colors 7-12, Colors 1-6
Fiber Count6, 12
Installation OrientationLeft Hand, Left Hand, Right Hand, Right Hand
LocationMulti-Dwelling Unit (MDU) and Multi-Tenant Unit (MTU)
Placement LocationHallway