The Proven Alternative for Challenging Thermal Upgrades


3M™ ACCR solves your most difficult upgrade challenges.



Use the Get Started link to let us know your requirements. Our team of design specialists and engineers can show you how 3M ACCR can make your job easier. Click here to see examples of actual customer installations.





Long Span/River Crossings

Rivers, canyons, wetlands, heavily underbuilt areas, densely populated areas and a variety of other situations often require special solutions. The outstanding strength-to-weight ratio and low thermal expansion of 3M ACCR enable long spans across these special areas, often with installation on existing or fewer structures, avoiding the need to change towers for taller ones, obtain additional rights-of-way or face difficult construction problems in these challenging areas. 3M's design specialists can help.

Case in Point:

A utility in Canada needed to cross two extremely long spans over environmentally sensitive waterways using only the existing towers. The customer installed 3M ACCR. The longest span with no towers was over a mile (1.5 kM). List of customer installations


Return to the top


Environmentally Sensitive Areas

Although all areas of the transmission grid have an impact on the environment, some areas are more delicate than others. The prospect of upgrading a transmission line by building a new line in an environmentally sensitive area is never an appealing idea. However, the use of 3M ACCR could make the process much easier. Use of existing towers with no additional land requirements and minimal disruption - all achievable because of the unique properties of 3M ACCR - can reduce the environmental impact to the surrounding areas. Installation is quick and the outstanding strength-to-weight ratio and low thermal expansion enable long spans and fewer structures across rivers, canyons and other sensitive areas with no change to the look of the existing line.

Case in Point:

An installation in Minnesota allowed a crossing over a protected wetland using existing rights of ways and towers, without the impact of heavy construction equipment. List of customer installations


Return to the top


Heavy Ice Regions

High strength to weight ratios and a high modulus combine to make 3M ACCR an ideal candidate for regions that experience heavy mechanical loads. 3M ACCR can increase reliability during the worst loading conditions, such as icing.

Case in Point:

An installation near Fargo, North Dakota has undergone severe wind and icing conditions with no failures, damage to the conductor, or unexpected changes in sag. List of customer installations


Return to the top


Corrosive Environments

Because both the wire and the core are made from aluminum-based materials, 3M ACCR is resistant to corrosive environments, even in coastal or high-pollution areas. No protective coatings are required to prevent galvanic coupling or corrosion, unlike steel or carbon polymer core conductors.

Case in Point:

An installation in Hawaii has been exposed to the most corrosive environment in the world for several years, with no corrosion problems. List of customer installations


Return to the top


Densely Populated or Under-built Areas

Lack of access to the land under the lines or the towers, strict clearance constraints, and densely populated areas in terms of people, traffic, and structures can increase risk and complicate upgrades to the transmission system. Because 3M ACCR can be installed quickly on existing structures, is installed much the same way conventional conductor is installed and comes with expert design and installation support, it can ensure a quick and successful project with minimal disruptions or additional land requirements.

Case in Point:

In a major downtown area, a critical line was upgraded through residential and commercial neighborhoods with many underbuilds. 3M ACCR was installed using only existing towers. List of customer installations


Return to the top


Changing Clearance Requirements

Clearance requirements over shipping lanes, highway crossings or other sites often change, but the need to deliver the same amount of power persists. Typically, structures would need to be raised or new towers built. However, replacing the existing conductor with 3M ACCR may meet the requirements with no change in diameter or tower loads and, often, with reduced tension.

Case in Point:

1780 kcmil ACSR running from a generating plant was replaced with a smaller 3M ACCR 675TW that runs frequently at high loading levels with no operational problems. List of customer installations


Return to the top





3M ACCR Home Page
Quick Clicks


Contact Us

Contact Us
Have questions?
Ready to get started?

Gridlines Newsletter


October 2009 Edition Now Available!


  • RUS List of Materials conditional acceptance
  • SAG10® users -- Data included in design software
  • Mumbia, India gets an upgrade
» Subscribe
» Open Gridlines Newsletter