Skip to 3M.com Primary Navigation Skip to Site Navigation Skip to Main Content
Top Image - Secondary Pages  

ACCR in the Media


3M™ Aluminum Conductor Composite Reinforced (ACCR) in the news



04/08/2008 Fort Mojave Tribal Utility Energizes 3M ACCR High-Capacity Line, Linking It to Western Area’s ACCR Upgrade on the Colorado River (PDF, 30 kb)
03/24/2008 Brazil’s Companhia de Transmissao de Energia Eletrica Paulista Chooses 3M ACCR for Upgrade of Line Over Parana River in Sao Paulo State (PDF, 29 kb)
02/19/2008 Alabama Power to Install 3M High-Capacity ACCR Conductor To Upgrade Key Transmission Line Near Birmingham (PDF, 27K kb)
01/16/2008 Platte River Power Authority Energizes 3M’s ACCR Conductor, Boosting Capacity on Key Line Serving Colorado’s Front Range (PDF, 38 kb)
11/26/2007 Allegheny Power to Install 3M High-Capacity ACCR Conductor To Upgrade Key West Virginia Line (PDF, 34 kb)
10/23/2007 Utility in People’s Republic of China Installs 3M’s ACCR To Boost Capacity on Key Line Serving Shanghai (PDF, 38 Kb)
09/24/2007 Western Area Power Administration Energizes First 20-Mile Segment Of 3M’s High-Capacity Overhead Conductor On Key Line Along the Colorado River in Arizona (PDF, 38 Kb)
02/01/2007 Native American Utility to Deploy 3M's High-Capacity ACCR Conductor (PDF, 38 Kb)
02/01/2007 Platte River Power Authority Chooses 3M's ACCR To Boost Capacity on Key Line Serving Northern Colorado (PDF, 38 Kb)
01/03/2007 Fort Mojave Tribal Utility Will Install 3M’s High-Capacity ACCR Conductor (PDF, 38 Kb)
12/25/2006 High Capacity, Low Sag - T&D World (PDF, 466 Kb)
09/25/2006 New Electric Line Doubles Power Flow - The Arizona Republic (PDF, 290 Kb)
07/10/2006 3M Announces Seventh Major Utility Installation Of ACCR (PDF, 25 Kb)
07/04/2006 Power Disruption in New Zealand Capital Underscores Importance Of New Transmission Technology Embodied in 3M’s ACCR (PDF, 26 Kb)
02/27/2006 3M's ACCR Overhead Conductor a Highlight of President Bush's Visit to Company’s Labs (PDF, 35 Kb)
08/29/2005 Two California Utilities Install 3M's Breakthrough High-Capacity Conductor (PDF, 27 Kb)
08/11/2005 Alabama Power Company Chooses 3M's New High-Capacity Conductor (PDF, 27 Kb)
07/14/2005 3M Joins National Electric Energy Testing Research and Applications Center (PDF, 18 Kb)
06/15/2005 3M's ACCR Chosen by Western Area Power Administration (PDF, 25 Kb)
06/01/2005 3M's ACCR Installed And Activated on Xcel Energy's Black Dog-Blue Lake Transmission Line (PDF, 35 Kb)




Quick Clicks