Skip to 3M.com Primary Navigation Skip to Site Navigation Skip to Main Content

3M™ PPS™ - Paint Preparation System

Steps 7-8



A new, innovative system for mixing and preparing refinish material prior to spraying.

3M(TM) PPS(TM) - Paint Preparation System

Step 7

Position locking collar onto the 3M™ PPS™ cup/liner and turn until tight.

  Position locking collar onto the 3M(TM) PPS(TM) cup/liner and turn until tight.

Step 8

3M™ PPS™ cup shaker core is used to distribute clamping force when shaker machines are used to mix.

  3M(TM) PPS(TM) cup shaker core is used to distribute clamping force when shaker machines are used to mix.

Intro | Steps 1-2 | Steps 3-4 | Steps 5-6 | Steps 7-8 | Steps 9-10 | Steps 11-12 | Steps 13-14 | Steps 15-16 |

Spray Gun Adapters | Premixed Paint | Cleaning | Order Info

Next Steps >>>

For safety always wear goggles, face shield and proper respirator when grinding or sanding or spraying. For safety always wear goggles, face shield and proper respirator when grinding or sanding or spraying.

Video Resources

Solution Video Library

3M™ PPS™ Resources

Spray Gun Adapters

Premixed Paint

Cleaning

Order Info