A growing economy and skyrocketing population need more electricity. But doing it without displacing residents will take an innovative update to traditional power lines.

“Scarcity of space prompts people in Mumbai to build homes wherever there is space.”
- Mohan Nair
EMD Sales Manager, 3M India
In crowded Mumbai, many homes are built on the legs of suspension towers. With a density of a million people per square mile, space is precious. And the towers are free, strong, and available.

At 20.5 million people, Mumbai is India’s most populous city, and it demands more electricity. But it’s nearly impossible to upgrade existing towers without destroying the homes built on and around them.

It’s only 6 weeks before the 2008 Olympic Games, and China needs more power. But there’s no time to build new towers. Turning to 3M, the Chongqing Electric Power Corporation chooses the same solution that will ultimately help Mumbai.

“We required a [power line conductor that] could be installed quickly and reliably within the existing infrastructure.”
- Wang Xinkuan
Chief Design Engineer, Chongqing Electric Power Corporation

Herve Deve and his team of 3M scientists found that an aluminum composite for the conductor core was better than the traditional steel one—just as strong but lighter. It could carry more power and sag less.

“It carried twice as much power at half the weight. We realized immediately it meant utilities wouldn’t need to build stronger or taller towers.”
- Herve Deve
Technical Manager, 3M Electrical Markets Division

Deve and his team wanted to find a way power lines could carry more electricity with considerably less sagging. More electricity means more heat, which means more sag. And when power lines sag, they can hit a tree, or another transmission line, causing an outage. It limits the power they can carry.

In Chongqing, the new power lines were installed on existing towers in only two weeks. The nearby Olympic venue had the power it needed, without disrupting neighboring communities. Then, a year later, the same ACCR technology was used in Mumbai. And no one lost a home.
More value from advanced grid investment: Reduce project time and cost while improving system value.
Over 100 years, we have forged inorganic materials into a surprising range of products.
Reducing the cost barrier makes the choice for renewable energy an easy one.